To ensure asbestos will not be disturbed during construction works.
Under Regulation 5 of the Control of Asbestos Regulations (2012), asbestos present within the scope of works must be identified, and if no assessment (refurbishment survey) has been carried out, then asbestos must be presumed to be present. A management survey is not sufficient to enable any intrusive works into the fabric of the building (no matter how small). If asbestos is disturbed, and you do not have an adequate refurbishment or demolition survey, you could face prosecution by the HSE if you instructed the works, and worse, end up with a criminal record.
Refurbishment surveys in particular must cover the scope of works planned, and we will not leave you with unanswered questions which may cause project delays. Helpfully if asbestos has been identified, we can help you project manage removal works.
We will work with your provided architects drawings to establish an exact scope of works. If you don't have architects drawings for the project, we will talk through the project in detail with you to ensure the survey is suitable.
We will talk through your survey needs with you to ensure that you get the right type of survey for your needs, get in touch now to get started.
Contact us now